Outline for Initial Training Sessions

Session #1 Goals for initial training.

A. Become familiar with the use of screens for an existing job:

Job Screen, Job Data Screen,
Flow Tree
Site Plan
Fab. Steel & Cast Iron Screen
Grate, Cover and Height
Pipe Screen
Range of possibilities

B. Become familiar with the use of screens for a new job:

All above plus…..

Structure Screen
English Reference Jobs
Storm only: 24”d, 36”d, 3’x 3’, 4’x 4’,5’x 5’, 6’x 6’
Sanitary & Storm mixed: 48”, 60”, 72”

Metric Reference Jobs
Storm only: 1200mm, 1500mm, 1800mm, 2400mm, 3000mm
600mm x 1200mm DIs, 600mm x 600mm DIs
600mm x 600mm CBs, M-Boxes
Sanitary only: Sanitary

Automatic Stacking Screen
Review Build Height Calculations
Goodness Criteria
Description-Only bases may have two lines

Plan View
Elevation View
Rollout View
Butterfly View

Reports Screen
Choices of Structures
Choices of Reports
BOM, BOM Summary, Custom Piece, Structure Drawing

C. Create, stack and print structure reports
Red River Example:                         Do five or six structures
Real Life Example #1:            Structure #1, Structure #2

Session #1 Review

Part #1 –Main Screen
File

Screens
Screen names

Help
Screen Icons

Part #2 – Job Setup

Job Screen, Job Data Screen

Part # 3 – Input with Red River Example

Flow Tree/Site Plan, Fabricated Steel, Pipe, Structure, Notes

Part #4 – Viewing

Status Screen
Site Plan, Plan View, Elevation View, Rollout View, Butterfly View

Part #5 – Automatic Stacking

Automatic Stacking Screen

Part #6 – Reports

Report Screen

Part #7 –Almost Nothing about Reference Jobs

Structure Design Screen

Part #8 – How to select/create a job

Job Screen, Job Data Screen

Part #9 – How to enter Structure Data

Flow Tree/Site Plan, Fabricated Steel, Pipe, Structure, Notes

Part #10How to stack a structure

Automatic Stacking screen

Part #11 – How to view Plan and Elevation views on-line

Plan View and Elevation View Screens
Rollout and Butterfly Views

Part #12 – How to create reports

Report Screen

Session #1 Homework

Several hours of practice should be spent on the above topics, doing the practice
example on Page 5 and then on representative simple structures of the type that your company will manufacture.  Keep a list of questions.  Do not use the Structure Design Screen.  The relationship of Reference Structures, Build Heights and Reference Jobs
will be handled in Session #2.

Session #2 Goals for initial training session #2.

Part #1 Understanding Structure Design, Build Height and Reference Jobs

Part #2 Using the Stack Editor

Session #3 Goals for initial training session #3.

Optional Review of Selected Topics

Part #1 Unlinked Data

Part #2 Archiving Data

Red River Example Training Problem – English Measurements (in feet and inches)

Struc
ture
Type T.O.C. Sump Steel Outlet Invert Inlet Invert From Angle Dist
ance
Pipe Pipe
Material
MH1 60” Storm 903.2’ 0” 1772 894.2’ 10.5’ 18” RCP C-Wall
894.2’ MH2 65° 33.5’ 18” RCP C-Wall
MH2 48” Storm 908.5’ 0” 1772 895’ MH1 33.5’ 18” RCP C-Wall
895.0’ MH3 188° 31.6’ 12” RCP C-Wall
MH3 48” Storm 907.1’ 0” 1772 896.6’ MH2 31.6’ 12” RCP C-Wall
899.0’ MH4 181° 57’ 12” RCP C-Wall
896.6’ MH5 242° 46.1’ 12” RCP C-Wall
MH4 48” Storm 913.1’ 0” 1772 901.7’ MH3 57’ 12” RCP C-Wall
MH5 48” Storm 912.5’ 0” 1772 898.5’ MH3 46.1’ 12” RCP C-Wall
905.1’ MH6 121° 37’ 12” RCP C-Wall
MH6 48” Storm 915.6’ 24” 1772 908.1’ MH5 37’ 12” PVC Sdr 35
908.1’ CB1 180° 15’ 8” PVC Sdr 35
908.1’ CB2 90° 15’ 8” PVC Sdr 35

Red River Example Training Problem – Metric Measurements (in meters)

Struc
ture
Type T.O.C. Sump Steel Outlet Invert Inlet Invert From Angle Dist
ance
Pipe Pipe
Material
MH1 1800 Storm 275.2 0 1772 272.5 3.2 .45 RCP C-Wall
272.5 MH2 65° 10.2 .45 RCP C-Wall
MH2 1200 Storm 276.9 0 1772 272.7 MH1 10.2 .45 RCP C-Wall
272.7 MH3 188° 9.6 .30 RCP C-Wall
MH3 1200 Storm 276.4 0 1772 273.2 MH2 9.6 .30 RCP C-Wall
274 MH4 181° 17.3 .30 RCP C-Wall
273.2 MH5 242° 14 .30 RCP C-Wall
MH4 1200 Storm 278.3 0 1772 274.8 MH3 17.3 .30 RCP C-Wall
MH5 1200 Storm 278.1 0 1772 273.8 MH3 14 .30 RCP C-Wall
275.8 MH6 121° 11.2 .30 RCP C-Wall
MH6 1200 Storm 279 .60 1772 276.7 MH5 11.2 .30 PVC Sdr 35
276.7 CB1 180° 4.5 .30 PVC Sdr 35
276.7 CB2 90° 4.5 .30 PVC Sdr 35